Project: 4511-0 Scale: Plan 1:1200; Profile 1:1200 (horiz) 1:48 (vert); Sections 1:48 Drainage Basin: Arthur Kill Connects to sheets: 17 and 19 Image is from a copy of the original on Mylar. Date surveyed July 1939 Drawn by P. C. Jensen Date approved 7/31/41 Profile stationing on this sheet measured along Center of Channel. Contains model of Conc. Pipe, down stream view, prof. stat. 76+59, State Highway-Route 35, scale 1:120. Contains model of Conc. Pipe, prof. stat. 73+25, Park Driveway, scale 1:120. Contains model of Elmwood Ave. Bridge, down stream view, pro. stat. 54+44, scale 1:120. Contains model of Concrete Bulkhead, downstream face-looking upstream, profile station 58+72, scale 1:120.